Matooke Republic
Saturday, November 8, 2025
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

National Building Review Board says swanky Lotis Towers should be evacuated to assess building’s structural integrity

Matooke Republic by Matooke Republic
August 17, 2022
in News
Reading Time: 2 mins read
22
SHARES
Share on FacebookShare on Twitter

The National Building Review Board has (NBRB) has recommended the evacuation of Lotis Towers, a swanky building in Nakasero for safety of tenants while a comprehensive structural integrity assessment of the entire building is conducted to inform the next actions to be taken.

This follows the attention of NBRB being drawn to the “compression failure of a Reinforced Concrete Column on the 6th floor of Lotis Towers, (a 14-level office Block) on Mackinnon Road, Kampala.”

“A team of Engineers visited the site to conduct a preliminary assessment of the defects on the structure and their effect on the safety of the occupants and the neighbourhood,” said in a statement.

RELATED POSTS

Court orders Uganda Airlines to pay former CEO Muleya Shs455 million for illegal dismissal

Qatar to open resident embassy in Kampala

The buildings Project Consultants and Contractor, Roko construction had studied the defects and were attempting to rectify the anomaly when NBRB instructed that the proposed remedial work methodology is submitted to KCCA’s Building Committee for review and approval, before an repairs can be undertaken.

To reach the decision of recommending an evacuation, the National Buildings Review Board noted several columns with similar signs of failure were observed in the basement.

The NBRB notes that despite these defects, the building’s management is in possession of an occupation permit (a document issued clearing a building for fitness of use).

The building houses corporate offices like Tullow Oil.

Related

Tags: Lotis TowersNational Building Review Board
Share9Tweet6Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

KCCA to close Lotis Towers after report on cracked columns

by Matooke Republic
3 years ago

...

Next Post

Over 100000 users will experience load-shedding every day, says UMEME as government plans to buy electricity from Kenya

Kyadondo East MP Nkunyingi spends a night on the streets of Dubai with stranded Ugandans

RECOMMENDED

China’s new five-year plan targets innovation, demand, and social progress

November 8, 2025

Guinness Smooth and AUMEX ignite conversations on the future of Uganda’s music industry

November 8, 2025

MOST VIEWED

  • Betsy Mugamba.

    Court upholds Sanyu FM’s dismissal of former Chief Operations Officer

    25 shares
    Share 10 Tweet 6
  • Here are the detailed timetables for the 2025 PLE, UCE, and UACE examinations

    110 shares
    Share 44 Tweet 28
  • Electoral Commission releases polling dates for 2026 general elections

    15 shares
    Share 6 Tweet 4
  • 29-year-old car washer sentenced to 21 months for stealing Shs 50 million from client’s vehicle

    13 shares
    Share 5 Tweet 3
  • How the New National IDs Look, What’s New About Them, and How to Collect Yours

    98 shares
    Share 39 Tweet 25
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2024

© Matooke Republic 2024

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.