Matooke Republic
Tuesday, December 16, 2025
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

National Building Review Board says swanky Lotis Towers should be evacuated to assess building’s structural integrity

Matooke Republic by Matooke Republic
August 17, 2022
in News
Reading Time: 2 mins read
22
SHARES
Share on FacebookShare on Twitter

The National Building Review Board has (NBRB) has recommended the evacuation of Lotis Towers, a swanky building in Nakasero for safety of tenants while a comprehensive structural integrity assessment of the entire building is conducted to inform the next actions to be taken.

This follows the attention of NBRB being drawn to the “compression failure of a Reinforced Concrete Column on the 6th floor of Lotis Towers, (a 14-level office Block) on Mackinnon Road, Kampala.”

“A team of Engineers visited the site to conduct a preliminary assessment of the defects on the structure and their effect on the safety of the occupants and the neighbourhood,” said in a statement.

RELATED POSTS

I sold everything I owned to fund my campaigns—Walukaga

Civil Aviation Authority ordered to pay Shs26 million to former employee sacked after exposing passenger smuggling 12 rhino horns

The buildings Project Consultants and Contractor, Roko construction had studied the defects and were attempting to rectify the anomaly when NBRB instructed that the proposed remedial work methodology is submitted to KCCA’s Building Committee for review and approval, before an repairs can be undertaken.

To reach the decision of recommending an evacuation, the National Buildings Review Board noted several columns with similar signs of failure were observed in the basement.

The NBRB notes that despite these defects, the building’s management is in possession of an occupation permit (a document issued clearing a building for fitness of use).

The building houses corporate offices like Tullow Oil.

Related

Tags: Lotis TowersNational Building Review Board
Share9Tweet6Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

KCCA to close Lotis Towers after report on cracked columns

by Matooke Republic
3 years ago

...

Next Post

Over 100000 users will experience load-shedding every day, says UMEME as government plans to buy electricity from Kenya

Kyadondo East MP Nkunyingi spends a night on the streets of Dubai with stranded Ugandans

RECOMMENDED

Sheebah Karungi.

Sheebah Karungi to headline Speke Resort Munyonyo New Year’s Eve Party

December 15, 2025

Sir Aludah, DJ Heydez & Mary Jo set to fire up the Tusker Cider vibe at December’s final Meating’s

December 15, 2025

MOST VIEWED

  • Gen. Moses Ali.

    86-year-old Gen. Moses Ali advised to stay away from campaigns

    26 shares
    Share 10 Tweet 7
  • Anne Juuko resigns from Standard Bank Group

    175 shares
    Share 70 Tweet 44
  • Sudhir Ruparelia unveils luxury Pool Pavilion at Speke Resort Munyonyo

    14 shares
    Share 6 Tweet 4
  • I sold everything I owned to fund my campaigns—Walukaga

    12 shares
    Share 5 Tweet 3
  • EC explains the grounds on which NUP’s Mathias Walukaga has been denominated from the Busiro East MP race

    35 shares
    Share 14 Tweet 9
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2024

© Matooke Republic 2024

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.