Matooke Republic
Monday, August 25, 2025
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

National Building Review Board says swanky Lotis Towers should be evacuated to assess building’s structural integrity

Matooke Republic by Matooke Republic
August 17, 2022
in News
Reading Time: 2 mins read
22
SHARES
Share on FacebookShare on Twitter

The National Building Review Board has (NBRB) has recommended the evacuation of Lotis Towers, a swanky building in Nakasero for safety of tenants while a comprehensive structural integrity assessment of the entire building is conducted to inform the next actions to be taken.

This follows the attention of NBRB being drawn to the “compression failure of a Reinforced Concrete Column on the 6th floor of Lotis Towers, (a 14-level office Block) on Mackinnon Road, Kampala.”

“A team of Engineers visited the site to conduct a preliminary assessment of the defects on the structure and their effect on the safety of the occupants and the neighbourhood,” said in a statement.

RELATED POSTS

Several people injured in sauna explosion in Buziga

Uganda Airlines carries out first in-house engine change after six years

The buildings Project Consultants and Contractor, Roko construction had studied the defects and were attempting to rectify the anomaly when NBRB instructed that the proposed remedial work methodology is submitted to KCCA’s Building Committee for review and approval, before an repairs can be undertaken.

To reach the decision of recommending an evacuation, the National Buildings Review Board noted several columns with similar signs of failure were observed in the basement.

The NBRB notes that despite these defects, the building’s management is in possession of an occupation permit (a document issued clearing a building for fitness of use).

The building houses corporate offices like Tullow Oil.

Related

Tags: Lotis TowersNational Building Review Board
Share9Tweet6Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

KCCA to close Lotis Towers after report on cracked columns

by Matooke Republic
3 years ago

...

Next Post

Over 100000 users will experience load-shedding every day, says UMEME as government plans to buy electricity from Kenya

Kyadondo East MP Nkunyingi spends a night on the streets of Dubai with stranded Ugandans

RECOMMENDED

Sheebah reclaims her crown at the ‘Return of the Queen’ concert

August 25, 2025

Explainer: Breaking Down the New Uganda Premier League Structure

August 25, 2025
  • 642 Followers
  • 23.9k Followers

MOST VIEWED

  • Uganda vs Senegal: CAF reduces online ticket purchases per person ahead of quarter-final clash this Saturday

    571 shares
    Share 228 Tweet 143
  • How to buy tickets for CHAN 2024 matches in Uganda

    536 shares
    Share 214 Tweet 134
  • Here is how to use NIRA’s new online portal to register or renew your national ID

    4168 shares
    Share 1667 Tweet 1042
  • New Desire Luzinda nud3s leak: Is she back to naked past?

    231 shares
    Share 92 Tweet 58
  • Jose Chameleone’s wife Daniella Atim files for divorce over desertion and emotional neglect; Seeks custody of five children and ownership of Sseguku matrimonial home

    72 shares
    Share 29 Tweet 18
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2024

© Matooke Republic 2024

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.