Matooke Republic
Wednesday, September 16, 2026
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

Arua Airport Probe: COSASE finds out Sh687m was spent on a wire fence, each metal seat cost Shs2.4m

Matooke Republic by Matooke Republic
November 6, 2021
in News
Reading Time: 3 mins read
45
SHARES
Share on FacebookShare on Twitter

As one of the four accountability committees of Parliament mandated to examine the audited accounts by the Auditor General detailing the appropriation of government funds to different Commissions, authorities, and enterprises, Members of the Parliamentary Committee on Commissions, Statutory Authorities and State Enterprises (COSASE) led by their chairperson Nakawa West MP Joel Ssenyonyi traveled to Arua to check on the on-going works at the Airport.

To Ssenyonyi’s  dismay, the money spent on purchasing certain items like the wire fence and trolleys was scandalous.

“COSASE came to Arua to check ongoing works at Arua Airport. 687m was spent on a wire fence! Also, several baggage trolleys and seats were bought and the seats were interlocked. Each single seat before interlocking cost 2.4m and each trolley 2.4m as well. This quite simply doesn’t add up,” Ssenyonyi posted.

RELATED POSTS

30 vehicles impounded as UPDF starts traffic crackdown on ministers, security chiefs

Police arrest 82 suspects in Kampala crime crackdown on traffic thieves, burglars

Arua Airport

Arua is the second busiest domestic airport in the country after Entebbe, with a monthly average of 180 air traffic movements. Presently, Eagle Air operates scheduled flights with a 19- seater aircraft. Ad hoc and charter flights are also operated by Mission Aviation Fellowship, United Nations, AIM Air, Samaritan Purse and Kampala Aero Club and Flight Training Centre.

Government has attempted to upgrade this airport multiple times, starting back in 2009. These plans included a new terminal building for up to 200 passengers and extending (and paving) the runway up to 2.5 kilometers (8,200 ft) to take international narrowbody aircraft. This would allow the airport to serve other destinations apart from domestic routes to Entebbe and become even more attractive for passengers in South Sudan and DRC.

Civil Aviation Authority

The upgrade of Arua Airfield to an international airport began in 2009 and was expected to be completed in March 2010.

 A  Shs1.53 billion terminal building, access road, and parking yard will be constructed under Phase I, Civil Aviation Authority (CAA) has said. In the subsequent phase, CAA also plans to expand the airfield by about 150 meters and tarmac the runway from 1.8 to 2.5 kilometers. The expansion of the total area as well as the runway will allow large passenger and cargo planes to land in Arua,” stated  Samuel Wonekha the  General Manager CAA in 2009.

A decade later, the interior of the new terminal building at Arua Airfield is still undergoing partitioning and furnishing.

Earlier on, more land was acquired for expansion of the airfield at a cost of about 6.5 billion to enhance its significance in regional trade.

CAA wants to upgrade the airfield to a Category 4C airport, which has a field length of more than 1,800 metres. The category 4C airport can accommodate a plane of wing length of up to 24metres.

According to Construction Review online, the government is currently soliciting for US $56m for the general upgrading of the airport to meet the regional and international standards. Wanokha maintains that the major works have been delayed because the government hasn’t secured the funds required.

Related

Tags: Arua AirportCOSASE
Share18Tweet11Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

COSASE grills BoU over failure to recover Shs140 billion Habba Group loan guaranteed in 2017

by Matooke Republic
14 hours ago

...

MPs question the Shs5.4 billion price tag of Civil Aviation Authority fire truck

by Matooke Republic
1 week ago

...

No compensation for Lubigi wetland occupants–NEMA

by Matooke Republic
2 years ago

...

L-R:Chairperson of the Board of UNBS, Charles Musekuura and Executive Director of UNBS David Livingstone Ebiru (middle) appearing before COSASE.

“I gave the Board Shs100 million bribe to save my job,” says UNBS Executive Director Ebiru

by Matooke Republic
3 years ago

...

Uganda Airlines officials snub to reappear before COSASE, requesting the probe to be done without media

by Matooke Republic
4 years ago

...

Next Post

Mukyala Doctor Rema Namakula flaunts baby bump photos after giving birth

Bridesmaid uses witchcraft to destroy friend's relationship months to wedding

RECOMMENDED

30 vehicles impounded as UPDF starts traffic crackdown on ministers, security chiefs

September 16, 2026

Police arrest 82 suspects in Kampala crime crackdown on traffic thieves, burglars

September 16, 2026

MOST VIEWED

  • Why ex-army Military Intelligence Chiefs Kandiho, Bakahumura were arrested

    49 shares
    Share 20 Tweet 12
  • Who is Prince Edward Kijanangoma Rukidi, the New King of Tooro?

    39 shares
    Share 16 Tweet 10
  • LIST: IGP Byakagaba transfers 21 senior officers in major reshuffle

    62 shares
    Share 25 Tweet 16
  • VIDEO: King Oyo shows off ‘dope’ dance moves at Princess Komuntale wedding

    404 shares
    Share 162 Tweet 101
  • What King Oyo’s Will Says About Who Should Succeed Him

    19 shares
    Share 8 Tweet 5
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2026

© Matooke Republic 2026

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.