Matooke Republic
Monday, February 2, 2026
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

National Building Review Board says swanky Lotis Towers should be evacuated to assess building’s structural integrity

Matooke Republic by Matooke Republic
August 17, 2022
in News
Reading Time: 2 mins read
22
SHARES
Share on FacebookShare on Twitter

The National Building Review Board has (NBRB) has recommended the evacuation of Lotis Towers, a swanky building in Nakasero for safety of tenants while a comprehensive structural integrity assessment of the entire building is conducted to inform the next actions to be taken.

This follows the attention of NBRB being drawn to the “compression failure of a Reinforced Concrete Column on the 6th floor of Lotis Towers, (a 14-level office Block) on Mackinnon Road, Kampala.”

“A team of Engineers visited the site to conduct a preliminary assessment of the defects on the structure and their effect on the safety of the occupants and the neighbourhood,” said in a statement.

RELATED POSTS

Besigye’s son raises alarm over father’s detention and health

Court-ordered recount hands NRM’s Justine Nameere Masaka Woman MP seat

The buildings Project Consultants and Contractor, Roko construction had studied the defects and were attempting to rectify the anomaly when NBRB instructed that the proposed remedial work methodology is submitted to KCCA’s Building Committee for review and approval, before an repairs can be undertaken.

To reach the decision of recommending an evacuation, the National Buildings Review Board noted several columns with similar signs of failure were observed in the basement.

The NBRB notes that despite these defects, the building’s management is in possession of an occupation permit (a document issued clearing a building for fitness of use).

The building houses corporate offices like Tullow Oil.

Related

Tags: Lotis TowersNational Building Review Board
Share9Tweet6Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

KCCA to close Lotis Towers after report on cracked columns

by Matooke Republic
3 years ago

...

Next Post

Over 100000 users will experience load-shedding every day, says UMEME as government plans to buy electricity from Kenya

Kyadondo East MP Nkunyingi spends a night on the streets of Dubai with stranded Ugandans

EC EC EC

RECOMMENDED

Besigye’s son raises alarm over father’s detention and health

February 2, 2026
Mowzey Radio.

Remembering Mowzey Radio: A look back at his impact on Ugandan music

February 2, 2026

MOST VIEWED

  • UNEB releases 2025 PLE results as candidate numbers rise and Division One passes improve

    49 shares
    Share 20 Tweet 12
  • LIST: Ministers who lost their seats in the 2026 Parliamentary Elections

    424 shares
    Share 170 Tweet 106
  • Jose Chameleone launches Chameleone FM in Burundi

    43 shares
    Share 17 Tweet 11
  • Court dismisses former Minister Sarah Opendi’s bid for a vote recount after losing Tororo District Woman MP race by just 35 votes

    18 shares
    Share 7 Tweet 5
  • Here are the heavy sanctions handed to Senegal and Morocco after AFCON final chaos

    13 shares
    Share 5 Tweet 3
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2024

© Matooke Republic 2024

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.