Matooke Republic
Tuesday, February 3, 2026
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

Yes, cable cars are coming to Kampala – Jennifer Musisi

Matooke Republic by Matooke Republic
June 5, 2017
in Featured Stories, News
Reading Time: 4 mins read
Share on FacebookShare on Twitter

In the third series of our interview of KCCA Executive Director Jennifer Musisi, she lays down Kampala city’s transport management master plan for us. 

We have seen the widened roads and new traffic lights on Kira Road and at the Fairway junction… are these going to be rolled out elsewhere?
We have a transport management master plan. You are going to see what you see at Fairway and Kira Road at 30 more places. We are widening junctions, installing traffic signals. Places like Mambule Road junction from Kalerwe to Bwaise; there are works at Makerere and we are putting traffic signals at Nakulabye, Bakuli, Kasubi, Ntinda and other places. Those lights have sensors and a control system so the lights are able to regulate frequency of traffic flow.



RELATED POSTS

Besigye’s son raises alarm over father’s detention and health

Remembering Mowzey Radio: A look back at his impact on Ugandan music

Why does it take long to do a short stretch of road in Uganda?
Initial issues like design, soil tests, quantification, contract advertising and selecting contractors, take time before the actual work begins. Under the roads we have National Water pipes, UTL, MTN, Airtel, name it.

Umeme has both underground and surface cables plus poles. You first establish where all these things are, then carry them out, and put service ducts so that now they can access them in one place. You have to put them out gently without damaging them because if you damage a water pipe, it means shutting down water flow for that whole part of Kampala and beyond. After that, you begin on actual work on the roads.

Even before that, we have to value and compensate land owners to expand roads. Disputes often arise where people sue you because they want more or they don’t want to build in their land, then you have to halt and wait for court decisions.

The recently expanded Kira Road has helped ease traffic flow during rush hours.

Can KCCA minimise inconvenience to road users by working at night instead of during busy traffic hours?
There is no gain without pain, but we try to minimise the painful period. People quarrelled about Fairway but they are enjoying the benefits.
Sometimes we work at night but it is very expensive because people have to be paid twice or thrice the usual fee, unless we have negotiated prior, like was the case of Jinja Road.

Taxis and boda bodas are a menace in this city…
Yes, we must regulate them. About two years ago, KCCA made an effort to register all boda bodas. We built a database of 54,000. The plan was to have the city zoned so that we have boda boda free zones, where you could drop but cannot park, then definite boda stages in the outer zones. We got a lot of resistance from the boda boda fraternity, yet we didn’t have support from other agencies.

Our staff were being beaten, vehicles were burnt, materials and computers were destroyed by rowdy boda bodas, they started stripping our sweepers… To protect our staff, we pulled out. It is now a security operation and Police is leading the registration, because they can enforce.

Taxis and boda bodas still rule the streets of Kampala. Attempts to regulate them were met by hostility. Now police has taken over the exercise as a security measure.

What about taxis?
They were also violent.

Do you have a timeframe for sorting this menace?
I can’t give a timeframe because Police is the lead agency.

Is there plan to modernise the rail transport system and increase frequency?
It is all part of our transport master plan. The trains belong to Rift Valley Railways, a private company and concessionaire, not KCCA. They were originally supposed to carry only cargo but we requested them to include passengers and their concession was amended.

Tracks from Namanve to Kampala, Kampala to Luzira and to Nalukonogo were repaired. The Namanve route is operational and the 3,000 people who use the train every day no longer want to use taxis. RVR plans to bring in more and better coaches.

Musisi has a test ride ona passenger train in 2015. It currently plies the Kampala – Namanve route but more routes are planned.

The bus service seems inadequate…
We advertised for a provider to bring in more buses and a contract was awarded to Wakula Enumme. I think with the dollar exchange rate they ran into problems. If they don’t deliver we shall get some other people. Pioneer is also not doing as well as they should because there is government support they expected that they didn’t get.

We have heard about introducing a cable car project
Yes…we are looking for financers. The initial route will be from Bwaise. We studied the population density and the demography and we thought it would be most viable. We shall drop off people at [Makerere] university and the New Taxi Park.

What are the timelines?
I can’t tell because I’m not the financier. I wish they could come tomorrow.


Also read about Jennifer Musisi letting us in on her private life. At home Mr Musisi is the boss.





Related

Tags: Jennifer MusisiKampalakcca
Share3Tweet2Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

NUP’s Ronald Balimwezo is the new Kampala City Lord Mayor

by Matooke Republic
1 week ago

...

KCCA to increase salary of street cleaners from Shs6K to Shs10K per day

by Matooke Republic
2 weeks ago

...

Qatar to open resident embassy in Kampala

by Matooke Republic
3 months ago

...

Mysterious bear mascots assist students of Buganda Road Primary School to safely cross the road.

Kampala wakes up to random acts of kindness

by Matooke Republic
3 months ago

...

Kabaka’s Lake to be redeveloped into an international urban tourism site

by Matooke Republic
7 months ago

...

Next Post

Prof. Mukiibi repented --- Catholic Church defends the late over children

VIDEO: When Prof. Mukiibi stated it's a taboo to ask an African man how many children he has

EC EC EC

RECOMMENDED

Besigye’s son raises alarm over father’s detention and health

February 2, 2026
Mowzey Radio.

Remembering Mowzey Radio: A look back at his impact on Ugandan music

February 2, 2026

MOST VIEWED

  • UNEB releases 2025 PLE results as candidate numbers rise and Division One passes improve

    50 shares
    Share 20 Tweet 13
  • LIST: Ministers who lost their seats in the 2026 Parliamentary Elections

    425 shares
    Share 170 Tweet 106
  • Jose Chameleone launches Chameleone FM in Burundi

    43 shares
    Share 17 Tweet 11
  • Here are the heavy sanctions handed to Senegal and Morocco after AFCON final chaos

    13 shares
    Share 5 Tweet 3
  • I have never won an election where voters are below Senior Six, says Mukasa Mbidde after contesting in four different constituencies

    44 shares
    Share 18 Tweet 11
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2024

© Matooke Republic 2024

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.