Matooke Republic
Thursday, December 18, 2025
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

Why Uganda Airlines is experiencing an operational crisis

Matooke Republic by Matooke Republic
December 16, 2025
in Business, News
Reading Time: 2 mins read
12
SHARES
Share on FacebookShare on Twitter

Uganda Airlines is struggling to keep its flight schedule on track because it does not have enough aircraft available to operate its network, a situation that has pushed the national carrier into an operational crisis at one of the busiest travel periods of the year.

At the centre of the problem is a reduced fleet. The airline normally relies on a small number of aircraft to serve both regional and long-haul routes, meaning that any technical setback quickly affects the entire system.

According to Chief Executive Officer Jenifer Bamuturaki, two planes are currently out of service due to technical faults, leaving the airline operating with significantly limited capacity.

RELATED POSTS

Asahi Group acquires Diageo’s stake in EABL

IGP rewards two private security guards with Shs500k each for refusing a bribe

One of the grounded aircraft is an Airbus A330 Neo, a wide-body plane that is crucial for long-haul flights. This aircraft is currently stuck in Lagos, Nigeria, after developing a technical problem and cannot be used until the required parts are sourced and installed. The airline is working with the manufacturer to resolve the issue, but until the aircraft returns to service, long-distance operations remain under strain.

The second grounded aircraft is a CRJ, which is typically used on regional routes. Its absence has further reduced scheduling flexibility, forcing the airline to make difficult choices about which flights to operate. With fewer planes available, Uganda Airlines has been compelled to combine some flights and delay others, creating a ripple effect across its timetable.

These fleet challenges have been made worse by operational factors beyond the airline’s control. Unexpected Notices to Airmen (NOTAMs) have disrupted flight timings, in some cases causing delays that result in aircraft arriving after destination airports have closed. When this happens, flights must be postponed, adding to passenger inconvenience and congestion at departure points.

The crisis became most visible over the festive travel season, when passenger numbers surged and delays and cancellations piled up at Entebbe International Airport. Travellers were left stranded or forced to wait for extended periods as the airline struggled to adjust its schedule with limited resources.

Bamuturaki has also sought to clear up public speculation about the fleet situation. Reports suggesting that a second Airbus A330 was stranded in London were incorrect, she said, explaining that the aircraft was in normal operation and due to land shortly.

Related

Tags: Uganda Airlines
Share5Tweet3Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

Minister Gen. Katumba Wamala.

Gov’t seeks Shs422 billion to buy 10 new aircraft for Uganda Airlines

by Matooke Republic
2 weeks ago

...

Cornwell Muleya.

Court orders Uganda Airlines to pay former CEO Muleya Shs455 million for illegal dismissal

by Matooke Republic
1 month ago

...

Uganda Airlines carries out first in-house engine change after six years

by Matooke Republic
4 months ago

...

Uganda Airlines secures over 500 bookings for new London route

by Matooke Republic
9 months ago

...

Uganda Airlines launches direct flights to London; Gov’t explains how it will promote tourism, trade

by Matooke Republic
9 months ago

...

Next Post

South Africa’s Dlala Thukuzin to headline 1420’s first anniversary celebrations

Strictly Soul to wrap Up 2025 with A Girls in Shades Affair at Mestil Gardens Tomorrow

RECOMMENDED

Hoima City Stadium set for grand opening on December 24

December 18, 2025

AFCON 2025: A look at how 24 teams will share the Shs114 billion prize money

December 18, 2025

MOST VIEWED

  • Sudhir Ruparelia unveils luxury Pool Pavilion at Speke Resort Munyonyo

    20 shares
    Share 8 Tweet 5
  • 86-year-old Gen. Moses Ali advised to stay away from campaigns

    31 shares
    Share 12 Tweet 8
  • I sold everything I owned to fund my campaigns—Walukaga

    18 shares
    Share 7 Tweet 5
  • Business mogul Bob Kabonero hosts Uganda’s business elite to an Exclusive Year-End Johnnie Walker Blue Club Experience

    14 shares
    Share 6 Tweet 4
  • Why Uganda Airlines is experiencing an operational crisis

    12 shares
    Share 5 Tweet 3
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2024

© Matooke Republic 2024

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.