Matooke Republic
Friday, November 13, 2026
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
Matooke Republic
  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos
  • Relationships
No Result
View All Result
Matooke Republic
No Result
View All Result

Government awards Japanese firm Shs98.4 billion contract to build new Karuma Bridge, construction to take three years

Matooke Republic by Matooke Republic
November 5, 2026
in News
Reading Time: 2 mins read
10
SHARES
Share on FacebookShare on Twitter

Government has awarded a Shs98.4 billion (approximately $24 million) contract to Japan’s ZENITAKA Corporation to construct a new bridge at Karuma along the Kampala-Gulu highway.

The project, being undertaken by the Ministry of Works and Transport, is expected to take three years to complete. Oriental Consultants Global will supervise the construction works to ensure the contractor meets the required standards and completes the project within the agreed timeframe.

According to project documents, the new Karuma Bridge will be 245 metres long and 11.5 metres wide, with three spans.

RELATED POSTS

IGP Byakagaba warns police officers against unnecessary arrests and detentions

Court of Appeal constitutes three-judge panel to hear Okello’s appeal against death sentence

The construction will be funded by the Japanese government through the Japan International Cooperation Agency (JICA) under its Official Development Assistance (ODA) loan programme.

The new bridge is expected to provide a safer and more reliable crossing over the River Nile, replacing an ageing structure that has served Uganda for more than six decades.

The existing Karuma Bridge was built in 1963, shortly after Uganda gained independence. It is a key transport link connecting Kampala to northern Uganda and neighbouring countries, including South Sudan.

However, the bridge has deteriorated over the years, requiring repeated repairs and temporary closures. Restrictions on heavy trucks have also disrupted the movement of goods and passengers along the busy highway.

The new structure will feature a modern cable-stayed design and will be built along a straighter alignment to eliminate the sharp curves that have made the current crossing dangerous.

Unlike the existing bridge, which will remain operational throughout construction, the new structure is designed to accommodate heavier traffic and improve the safety and efficiency of transport along the Kampala-Gulu highway.

Related

Tags: Karuma BridgeMinister of Works and TransportZENITAKA Corporation
Share4Tweet3Send
Matooke Republic

Matooke Republic

Freshly peeled info from area code 256

Related Posts

Here are the new guidelines for school educational trips

by Matooke Republic
4 months ago

...

What motorists should expect under the new Express Penalty System and speed limit reforms as speeding fines are harmonised to Shs160,000 and payment window extended to 28 days from 72 hours

by Matooke Republic
5 months ago

...

Transport Ministry revamps Traffic Penalty System to curb errors and address public outcry

by Matooke Republic
8 months ago

...

Minister Gen. Katumba Wamala.

Gov’t seeks Shs422 billion to buy 10 new aircraft for Uganda Airlines

by Matooke Republic
12 months ago

...

Man tries to jump off Karuma Bridge to ‘float’ to Egypt

by Matooke Republic
1 year ago

...

Next Post

Kyabazinga and Queen Jovia Mutesi welcome their third child

Man fined Shs4.8 million for offering police officers Shs8 million bribe to access a crime scene

RECOMMENDED

Golfers pose for a photo moment before teeing off in the previous quarterly tournament of the I&M Bank Serena Golf Series.

I&M Bank Serena 63 returns for 2026 season finale this Saturday with full course expected

November 12, 2026
IGP Abas Byakagaba.

IGP Byakagaba warns police officers against unnecessary arrests and detentions

November 12, 2026

MOST VIEWED

  • LIST: Museveni appoints 13 new Permanent Secretaries

    30 shares
    Share 12 Tweet 8
  • Deputy Army Commander Okiding speaks out on Elwelu saga, explains why security forces went looking for him and how they found him

    19 shares
    Share 8 Tweet 5
  • Who is Beatrice Lugalambi, the new Executive Director of Pride Bank?

    17 shares
    Share 7 Tweet 4
  • Wedding: Museveni hands over daughter Georgina to policeman

    546 shares
    Share 218 Tweet 137
  • Here’s how Uganda’s A-Level grading system is going to look; O and F grades to be removed from the main grading scale

    139 shares
    Share 56 Tweet 35
Matooke Republic

Uganda's only free Newspaper. Out every Thursday. Freshly peeled info. kiwatule, Kampala, Uganda.

  • Home
  • News
  • Entertainment
  • Gossip
  • Features
  • Business
  • Sports
  • Health
  • Photos

© Matooke Republic 2026

© Matooke Republic 2026

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.